D.I.Y. Installation

Laying

Turf Laying
  1. Spread fertiliser on soil.

  2. Start at a straight edge such as a path or driveway.

  3. Stagger the joints in each new row like a row of bricks.

  4. Make sure all joints (sides & ends) are butted together tightly without overlapping.

  5. Use a large knife or spade for cutting turf around trees, beds and edging.

  6. Water your turf as you go, starting 15 minutes after you lay the first roll.

  7. Turf Laying
  8. After you have installed all of your turf, use your roller to smooth out any footprints etc. This will also remove any air pockets and ensure the turf makes good contact with the soil.

  9. Give the whole area a good soaking. We recommend 25mm of water for it's first watering. To measure simply place a container under the sprinkler until it has 25mm in the bottom.

For further assistance, please call us 61-7-3114 8230.