| Job Description: |
The new school development of Stretton College incorporated a school oval for use in both athletic and team sports. The site was cut and filled using existing site soil. The site was then built from the sub-grade up. Jimboomba Turf screened the existing soil, incorporating amendments to correct the nutrient level. These amendments were cultivated through the soil to provide a consistent, mirror image surface. 30,000m2 of turf was laid, and Jimboomba Turf also provided 12 weeks grow-in and maintenance before handing over the oval to Stretton College. |